Skip to content

Pull requests: StackStorm/st2

Author
Filter by author
Label
Filter by label
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Milestones
Filter by milestone
Reviews
Assignee
Filter by who’s assigned
Sort

Pull requests list

Create pantsbuild BUILD files with ./pants tailor :: infrastructure: ci/cd maintenance pantsbuild size/L PR that changes 100-499 lines. Requires some effort to review.
#5738 opened Sep 20, 2022 by cognifloyd Loading… pants
[WIP] Add python3.9 to GHA size/M PR that changes 30-99 lines. Good size to review.
#5730 opened Sep 16, 2022 by amanda11 Draft
[WIP] Encryption and decryption of secrets at rest size/L PR that changes 100-499 lines. Requires some effort to review.
#5722 opened Sep 5, 2022 by neeraj-orch Draft
[RFC] TSC Governance Proposal: Document the TSC Meetings host rotation no changelog No Changelog.rst needed for this PR size/S PR that changes 10-29 lines. Very easy to review. TSC PR managing GOVERNANCE or other TSC documentation
#5711 opened Aug 17, 2022 by armab Loading… 3.8.0
Implementing SSO/SAML login :) size/XXL PR that changes 1000+ lines. You should absolutely split your PR into several.
#5664 opened Jul 2, 2022 by pimguilherme Loading…
Run st2-self-check in Github Actions size/L PR that changes 100-499 lines. Requires some effort to review.
#5609 opened Apr 2, 2022 by winem Draft
Bump ujson from 4.0.2 to 5.1.0 external dependency python3 size/XS PR that changes 0-9 lines. Quick fix/merge. status:on hold Feature, design or idea with undecided status to include in the project functionality
#5551 opened Jan 21, 2022 by dependabot bot Loading…
Add required dependency to support etcd3gw driver. feature proposal size/S PR that changes 10-29 lines. Very easy to review. status:under discussion
#5528 opened Jan 6, 2022 by khushboobhatia01 Loading…
WIP: Labels size/L PR that changes 100-499 lines. Requires some effort to review. WIP
#5415 opened Oct 27, 2021 by cognifloyd Draft
Add workflow system info in Workflow Execution context size/M PR that changes 30-99 lines. Good size to review. status: potential performance implications
#5405 opened Oct 24, 2021 by khushboobhatia01 Loading…
limit memory and output service: action runner size/L PR that changes 100-499 lines. Requires some effort to review. status:need more info status:needs cla A manual tag to note PRs that are otherwise ready, but the CLA bot says the CLA has not been signed. status:needs tests
#5320 opened Aug 5, 2021 by Moradf90 Loading… 3.8.0
Bump eventlet from 0.30.2 to 0.31.0 bug external dependency security size/M PR that changes 30-99 lines. Good size to review.
#5257 opened May 8, 2021 by dependabot bot Loading… 3.8.0
Expose timeout parameter to packs.install on st2 client pack install API CLI component:st2client service: api size/M PR that changes 30-99 lines. Good size to review. status:needs changes status:needs cla A manual tag to note PRs that are otherwise ready, but the CLA bot says the CLA has not been signed. status:needs tests
#5174 opened Mar 2, 2021 by hnanchahal Loading…
Changes in the hash algorithm database migrations security size/L PR that changes 100-499 lines. Requires some effort to review. status:under discussion
#5161 opened Feb 22, 2021 by ashwini-orchestral Draft
[RFC] TSC Chair definition and election procedure v2 documentation size/M PR that changes 30-99 lines. Good size to review. stale status:under discussion TSC PR managing GOVERNANCE or other TSC documentation
#5135 opened Feb 1, 2021 by armab Draft
Refactor FileWatchSensor to remove logshipper enhancement external dependency packs refactor size/XXL PR that changes 1000+ lines. You should absolutely split your PR into several.
#5096 opened Nov 29, 2020 by blag Draft 3.8.0
TSC Chair definition and election procedure size/XS PR that changes 0-9 lines. Quick fix/merge. stale TSC PR managing GOVERNANCE or other TSC documentation
#5071 opened Nov 3, 2020 by dzimine Loading…
Document Conflict of Interest Situations documentation size/S PR that changes 10-29 lines. Very easy to review. TSC:voting Items related to Technical Steering Committee voting TSC PR managing GOVERNANCE or other TSC documentation
#5045 opened Sep 23, 2020 by armab Loading…
st2client - elapsed time in a more user-friendly format enhancement size/M PR that changes 30-99 lines. Good size to review. status:needs tests
#4963 opened Jun 6, 2020 by winem Draft
ProTip! no:milestone will show everything without a milestone.