Go-live checklist

[This topic is pre-release documentation and is subject to change.]

Important

  • Power Pages is an evolution of Power Apps portals, and the new features introduced by Power Pages such as the new design studio and templates are in preview for users to try and provide feedback. We recommend that you wait until the general availability of Power Pages later this year to use sites created using the new Power Pages design studio in production scenarios.
  • All the platform, site admin, and pro-developer capabilities inherited by Power Pages from Power Apps portals are generally available and can be used in production scenarios. More information: Power Pages and Power Apps portals

The Set up workspace inside the design studio includes a built-in go-live checklist that includes various interactive tasks that help you prepare your site to go live. These tasks include guided experiences to view and complete recommended actions.

Use the Go-live checklist guide to ensure you don't miss anything before your site is up and running. You can also go through additional recommendations in this article to help you extend your go-live preparations and improve the overall site experience when the site goes live.

Note

The go-live checklist and the additional go-live guidance in this article are recommended actions. The checklist and actions explained in this article aren't mandatory for the site to be up and running.

Go-live checklist in the Set up workspace

Making site live for production use is critical step, and the Go-live checklist section from Set up workspace integrates this process seamlessly with your site building activities.

The checklist includes various actions that you can follow up through a step-by-step exercise with a built-in experience that shows the step completion as you progress.

Go-live checklist option in Set up workspace.

Here's the steps included in the go-live checklist:

Number Task Success criteria
1 Run the site checker 0 Errors in the portal checker last run results
2 Pick and allocate licenses Licenses are allocated, and acknowledgment in the form of marked as completed
3 Convert site to production Site is converted to production
4 Enable CDN to load site faster Content Delivery Network (CDN) is enabled
5 Enable WAF to secure your site Web application firewall (WAF) is enabled
6 Connect custom domain Custom domain configured, is up and working (to check if the URL is accessible)

Here's an example of how the checklist looks like as the steps progress:

Go-live checklist once completed.

While completing the go-live checklist helps you better prepare and avoid any misses for considerations before the site is up and running, also consider the additional go-live guidance.

Additional go-live guidance

Apart from the benefits of Go-live checklist, use the following additional guidance to help you plan your Power Pages projects.

Create separate development, testing, and production sites

To continue to make updates to your site without breaking functionality for existing users of your site, we recommend three separate environments to manage the application development lifecycle.

More information: Power Platform application lifecycle management for more information.

Configure authentication set up

By default Power Pages sets local authentication as your identity provider. We recommend using one of the supported identity providers as your default and disabling local authentication.

For example, Azure Active Directory B2C.

Tip

  • Finish setting up your custom domain to utilize the redirect URL for the authentication provider.
  • If you're using the Azure AD sign-in button, you can rename it to reflect meaningful label. Using the Portal Management app, create the site setting Authentication/OpenIdConnect/AzureAD/Caption for your specific website and set the name you want.

More information: Configure authentication

Test your site performance

Optimize your site's performance by enabling a content delivery network (CDN) through the Go-live checker explained earlier. Additionally, for high scalability needs (thousands of users a month or a critical workload), consider performing load testing to understand the type of performance you'll get and troubleshoot any problem areas.

Areas to consider:

  • Number of visitors to your site on a daily basis.
  • Traffic volumes at different times.
  • High traffic pages linked to Microsoft Dataverse.
  • Volume of data stored in Dataverse.

Set up telemetry monitoring

You can place the telemetry tracking HTML/JS snippet of code in the Enable Traffic Analytics area in the Portal Management app.

Open the Portal Management app and navigate to the Enable Traffic Analysis section. Enter the snippet from your analytics provider.

Portal analytics.

Finalize your site

Clean up your site and remove any sample webpages, sample text, and placeholder images.

Delete or deactivate any unused pages.

Change your browser suffix from "Home page - Starter Portal" to a meaningful name. You can find the content snippet "BrowserSuffix" in the Content Snippets area of the Portal Management app

Set your specific copyright text, and add any privacy or other links in the "Footer" web template. Find it in the Web templates area of the Portal Management app.

Protect any unfinished page by using Page permissions.

Manage site visibility

Configure site visibility after verifying the site is ready to be up and running. More information: Site visibility